Project Curacao Software Status (01/04/14)
We are now doing system testing on the control software. We have tested battery voltage shutdowns/startups, watchdog shutdown/startups, and alarm based shutdowns/startups. Next, we have to test the deadman switch and add the 15W Wind Turbine. Then the final testing […]