SwitchDoc Labs Products
[section]
[column size=”col-4″]
[include-page id=”buy-include-file”]
[/column]
[clear]
[separator ]
[/section]
[include-page id=”products-include-page”]
[clear]
[separator ]
[section]
[clear]
[/section]
[section]
[column size=”col-4″]
[include-page id=”buy-include-file”]
[/column]
[clear]
[separator ]
[/section]
[include-page id=”products-include-page”]
[clear]
[separator ]
[section]
[clear]
[/section]
Copyright © 2024 | MH Magazine WordPress Theme by MH Themes
First steps in assembly of “Ultimate Solar Powered WiFi Night Light Kit (BC24 and ES32) I have a problem.
Step By Step Assembly of the BC24 Solar Night Light Kit
Step 1) Familiarize yourself with all of the parts A-H above.
Step 2) Locate the SunAirPlus board (B) and the Grove Cable – Female Header to Grove Connector (G).
Step 3) Connect the Grove Cable Female Headers (G) to the SunAirPlus Board (B) as shown below. DO THIS STEP CORRECTLY!
You connect the included Grove to Female Pin Headers Adaptor Cable to the “From Computer” header as shown below.
August 8, 2018 Page 11 of 34 Version 1.01
My hardware does not match the photo.
My SunAirPlus 2 board has 4 pins inside a white Globe connector rather than 4 bare pins. My Grove cable -Female Header to Grove Connector has a Grove white connector that fits to the Big Circle 24 board. The 4 separate connectors will not fit into the Globe connector on the SunAirPlus 2 board.I am not equipped to re-manufacture parts.
I need advice, this is mu first project.
Send a message to customerservice@switchdoc.com and we will send you a grove cable!